Project Case Study
A 6,000 square foot data hall with 200 server racks, powered down, cleared, and handed back ready for its next use.
The Project
This St. Louis facility was shutting down a 6,000 square foot data hall holding 200 server racks, two 225 kVA UPS systems, and the electrical switchgear behind them. Powerhouse Systems powered down the room, disconnected and removed the racks and power equipment, and staged everything for loadout. Our own crew performed the disconnect, rigging, and removal, and the room went back to the owner cleared and ready for whatever comes next.
Before, During, After




Equipment Recovered
Recovered equipment is refurbished and resold, which is what lets us pay for the gear we remove instead of charging to haul it away.
Whether it is a single equipment room or a full facility, we handle the electrical and IT scope from walkthrough to broom-clean handover.
See our Data Center Electrical Decommissioning services · More projects: Oak Ridge · Kansas City · Nanuet · Raleigh · San Diego